Client Testimonials

We at Kjeldsen, Sinnock & Neudeck Inc. pride ourselves on our work and our working relationships. Below are some commendations clients have sent either to us or to others on our behalf. 

Association of California Water Agencies Region 4 
Robert S. Roscoe, Chair, Region 4
May, 2012

"Your wealth of experience and knowledge about the Delta levees made your portion of the program enjoyable and insightful for all attendees.  We look forward to facilitating more opportunities in the future that bring experts together to share their knowledge with the local water community." 

California Land Surveyors Association
Bill Koch, Chapter Vice President, and Landon Blake, Chapter Secretary
Briggsmore Calibration Baseline Project

August, 2011

"[KSN]'s participation in the rehabilitation and measurement of the calibration baseline is a testament to your commitment to advancing the practice of land surveying and upholding high standards of professional practice for land surveyors." 

City of Stockton 
Ray Deyto, P.E., Project Manager, City of Stockton Public Works Department
Interstate 5/French Camp Road Interchange Reconstruction Project
August 12, 2008

"KSN exceeded all expectations as part of the design team..."

Mark J. Madison, P.E., Director of Municipal Utilities, City of Stockton
City of Stockton Municipal Utilities Department Influent Pipe Replacement Project
September 30, 2008

"KSN’s experience and efficient use of state of the art technology were critical to the success of the project.  KSN met and exceeded the expectations of the project team by responding quickly with professional service."

Alex Menor, Project Team Leader, City of Stockton Public Works Department
City of Stockton Airport Way Beautification Project, Phase 2
January 27, 2010

"I have been impressed with KSN customer service, accessibility, responsiveness, professionalism, quality of plans, and timely completion of deliverables for Phase 2.  KSN Rocks!!!"

Michael M. Niblock, Director, City of Stockton Community Development Department
City of Stockton Downtown Marina and Joan Darrah Promenade Project
June 2, 2010

"[The Downtown Marina and Joan Darrah Promenade Project] has been selected by the Planning Commission and Cultural Heritage Board of the City of Stockton as a subject worthy of public recognition through its citation program.  Accordingly, the Planning Commission wishes to bestow upon [KSN] its Award of Excellence [for making a notable civic contribution by strengthening the visual appearance of metropolitan Stockton]."

Antonio S. Tovar, Associate Civil Engineer, City of Stockton Municipal Utilities Department
City of Stockton Well SSS#9 Design-Build Project
September 24, 2004

"KSN’s meticulous attention to detail, and time schedules resulted in a successful and commendable design-build project.  The City of Stockton is very delighted with [the] quality of work and results of the Well SSS#9 Design-Build Project." 

County of San Joaquin
Ronald E. Baldwin, Director, County of San Joaquin Office of Emergency Services
San Joaquin County Flood Contingency Mapping Project
September 22, 2010

"KSN, Inc. consistently has gone beyond the strict terms of their contract to ensure that the highest quality products were produced.  In some supplementary elements of the project that had never been done before, KSN, Inc. set the standards for how to complete and format final products." 

Floyd Johnston Construction Co., Inc.
Evelyn Johnston, Vice President
Stockton East Water District Peters Pipeline Design-Build Project
September 27, 2007

"KSN’s commitment, teamwork and dedication was instrumental in completing this project ahead of the District’s schedule and within the established budget.  Stockton East Water District was very pleased with the overall project and our team approach." 

HDR Engineering, Inc.
Timothy R. Fleming, P.E., Senior Vice President
March 29, 2008

"[KSN has] performed well for us, and we can trust that you will stand behind what you do.  We will continue to look for joint opportunities."

October 14, 2009
"[I] saw that [KSN] was included on the [CE News] best firms to work for list…  [Part] of being a good firm to work for is the commitment to professionalism, and for doing the right thing.  And [KSN] does that very well, which makes you a great firm to work with as well.  Thank you for being great teaming partners."
(Emphasis by author)

Carlton Haack, P.E., Vice President
Interstate 5/French Camp Road Interchange Reconstruction Project
August 22, 2008

"KSN was faced with many challenges throughout the life of the project.  KSN met or exceeded the expectations of the project team by providing professional, timely, and courteous services."

October 16, 2009
"Thanks for the continued good, responsive service and coordination." 

Try Khou
State Route 99 Manteca Six Lane Widening Project
July 10, 2012

"We never doubt your work!!!" 

John A. Klemunes, Jr., Sacramento Area Transportation Manager
State Route 99 Manteca Six Lane Widening Project
September 28, 2011

"KSN's staff met the challenges of the aggressive schedule and delivered all of their services on time and within budget... The professional services and mapping provided by KSN throughout the project duration are a key factor in the overall success of the project." 

State Route 99 Manteca Six Lane Widening Project
July 10, 2012
“You guys are the best.  Always responsive and your product is top notch.” 

James A. Yurczyk, P.E., Vice President
Incline Village General Improvement District (IVGID) Export Pipeline Project
September 29, 2004

"KSN was faced with many challenges during the project, including change of scope throughout the Predesign phase, mapping across difficult terrain and varying topography, inconsistent coordinate systems provided on previous projects, and critical deadlines…  KSN exceeded HDR’s expectations by making available the appropriate staff to complete the aerial based topography and digital photography ahead of schedule and under budget." 

Peterson Brustad Inc.
Barry O’Regan, P.E., Principal
San Joaquin Area Flood Control Agency (SJAFCA) Provisionally Accredited Levee (PAL) Submittals to Federal Emergency Management Agency (FEMA)
March 26, 2010

"…on behalf of PBI I want to thank [KSN] for all your help with these projects.  Your staff did an outstanding job developing the information and analyses we needed to complete these projects.  And as well as doing a great job, your staff is also a pleasure to work with." 

Power Engineering Contractors, Inc.
David Mik, Vice President
City of Stockton Municipal Utilities Department Influent Pipe Replacement Project
September 8, 2008

"KSN’s 3-D scanning team was fundamental in our ability to efficiently replace the [existing corroded raw sewage influent] pipes in a fiscally prudent manner...  The Stockton MUD Pipe Replacement Project is not glamorous.  In fact, many people will never know of its completion.  Because of KSN and the efficient use of state of the art technology the people of Stockton benefit." 

Quincy Engineering, Inc.
R. Brent Lemon, P.E., Project Manager
City of Stockton El Dorado Street Phase 2 Widening Project
August 31, 2007

"KSN’s involvement with this project and their familiarity with the Client on past projects has been key to the design team’s success to date.  We have appreciated the quality products that KSN has produced for us on this project." 

Reclamation District No. 800
Jeffrey D. Conway, District Manager
May 31, 2005

"Kjeldsen, Sinnock, & Neudeck are an exceptional engineering firm and have a long standing professional relationship with Reclamation District No. 800 as well as our Board of Trustees. Throughout their history of working with The District, KSN has an outstanding knowledge base that is irreplaceable." 

San Joaquin Council of Governments
Kevin Sheridan, Project Manager
State Route 99 Manteca Widening
September 29, 2011
"KSN fulfilled their role with the highest degree of professionalism and efficiency in performing their tasks.  In doing so, the services provided were instrumental in dividing a single complex $250 million dollar project into a multi-phased project.  As a result each phase of the project can be built separately." 

Kevin G. Torell, Regional Planner
Rustan 630 Addition Project
August 12, 2005

"I just want to thank you for your continual patience and urgency with our projects.  The Rustan 630 addition was perfect and got to us in no time.  Thanks again for all the hard work." 

Stockton East Water District
Kevin M. Kauffman, General Manager
Stockton East Water District Peters Pipeline Project
September 21, 2007

"KSN exceeded all expectations as part of the design-build team for this successful project."