Sperry Road Extension - City of Stockton Department of Public Works

The Sperry Road Extension Project will extend Sperry Road from Performance Drive west to the French Camp Road/Interstate 5 Interchange.  The Interchange will be reconstructed in a separate project as a critical component of the overall improvements identified in the Arch-Airport/Sperry Road Specific Road Plan.  The first phase of the Sperry Road Extension Project will construct a four lane industrial thoroughfare that will ultimately be expanded to eight lanes.  The roadway will be constructed on an elevated roadway section that will cross three railroad corridors, El Dorado Street, McKinley Avenue, as well as French Camp Slough. 

Kjeldsen, Sinnock & Neudeck, Inc. (KSN), working as the civil engineering and surveying sub-consultant to Rajappan & Meyer Consulting Engineers, Inc., performed all surveying, mapping, flood control permits acquisition, right of way engineering, drainage design, and utility extension coordination required for construction of the project. 

Project Highlights
  • City of Stockton Department of Public Works
  • Sperry Road from Performance Drive to Interstate 5, Stockton, California
  • Construction: $40,000,000
  • Engineering: $3,500,000